Weekly Updates
Weekly production and development updates for the MDR Dasher keyboard.
| # | Date | Highlights |
|---|---|---|
| 33 | Sep 23, 2026 | Order emails, shipping address confirmation, certification lab photos and packaging test findings. |
| 32 | Sep 2, 2026 | EMI, ESD and EFT tests all passed on September 1. PCB going into production, aiming to ship in September with delivery around October, address confirmation email coming in the next few days. |
| 31 | Aug 26, 2026 | A new shipping address confirmation step is coming in the next few days, with instructions shared in a separate update or by email. |
| 30 | Aug 16, 2026 | SGS pre-test results, packaging design, final address confirmation, and first-batch shipping still targeted for September. |
| 29 | Aug 9, 2026 | A brief check-in on certification, packaging, and the remaining finishing details. |
| 28 | Jul 27, 2026 | Deskmat photos, trackball status, and shipping is still scheduled for September. |
| 27 | Jul 20, 2026 | The keyboard cases are in QC, certification is underway, and we are sharing photos from our factory visit and OEM assembly sample. |
| 26 | Jul 12, 2026 | XDA is being replaced with OEM for this production run, while OEM and SA orders are unchanged. |
| 25 | Jul 5, 2026 | Aluminum travel case, switch can, trackball mouse button keycaps, and key puller samples in. Packaging design underway. |
| 24 | Jun 28, 2026 | Working closely with our suppliers to keep the remaining production items moving toward assembly. |
| 23 | Jun 21, 2026 | All five switch colors finished sampling and are confirmed for production. |
| 22 | Jun 15, 2026 | Switch color matching, Retro case texture, CNC components, PCB certification testing, aluminum travel case design, and the current working timeline. |
| 21 | Jun 7, 2026 | Final lock-in reminder: if a portal change saves successfully, it has been recorded. Configuration and nameplate changes close on June 7, 2026 at 11:59 PM Pacific Time. |
| 20 | May 31, 2026 | Everything else is on track. The keyboard port is moving back to USB-C with a sourced panel-mount connector, the retro case finish is confirmed as textured white, and nameplate customization is extended to June 7, 2026. |
| 19 | May 24, 2026 | Some retro panel samples arrived, including a cream-yellow aging-reference direction. Five switch color directions heading to sampling, and portal changes should be confirmed by email. |
| 18 | May 17, 2026 | SPSA and OEM R3 keycaps ready, a first preview of the PCB artwork, and a new switch color direction we'd love feedback on. |
| 17 | May 10, 2026 | Short check-in. Open items from recent updates are still moving forward. |
| 16 | May 4, 2026 | Switch Live Sound Test page is live with in-browser sound demos for all five switches. New nameplate samples in. |
| 15 | Apr 26, 2026 | Accessory kit samples confirmed. Packaging print samples under review. Trackball firmware tuning underway with PixArt feedback. |
| 14 | Apr 19, 2026 | Trackball bowl T2 complete and ready for mass production. Nameplate laser engraving samples in testing. |
| 13 | Apr 12, 2026 | Trackball mold and T0 trial complete. Nameplate samples now in testing. |
| 12 | Apr 7, 2026 | PCB firmware configurator preview. Trackball in trial molding. |
| 11 | Mar 30, 2026 | Plates and middle frames in final stages. Trackball and package design in progress. |
| 10 | Mar 24, 2026 | Documentation website launched. SP SA keycaps complete. MDR switch revealed. |
| 9 | Mar 16, 2026 | Website launched with switch specs comparison. Production updates on switches and CNC parts. |
| 8 | Mar 9, 2026 | MDR Terminal rebuilt. New portal with order management, keycard login, and firmware tools. |
| 7 | Feb 22, 2026 | PledgeBox orders locked during Shopify migration. Factories reopening after Chinese New Year. |
| 6 | Feb 16, 2026 | Texture poll results with 148 responses. Confirmed direction for white and blue case finishes. |
| 5 | Feb 9, 2026 | Case mold finished, pre-CNC samples out. Vote on your preferred texture finish. |
| 4 | Feb 2, 2026 | Trackball PCB, portal software, and factory case mold progress. |
| 3 | Jan 26, 2026 | Mouse button keycap test samples received. All four custom Atomic switches revealed. |
| 2 | Jan 19, 2026 | Tooling progress on case mold, mouse button keycaps, and trackball housing. |
| 1 | Jan 12, 2026 | The 3D Customizer is live. Explore every layout, keycap profile, and nameplate option. |